Processing PBG & SLF

Building Permit/Persetujuan Bangunan Gedung (PBG) is a permit granted to a building owner to construct new, or modify accordance with the applicable building technical standards. Sertifikat Laik Fungsi (SLF) is a Certificate of Function Worthiness, certificate issued by the Local Government to declare the worthiness of a building's function before it can be utilized.

Get The Experts
Hero Left Image
Hero Right Image

10+ Years of Experience

Making PBG (Building Approval)

Building Approval, or abbreviated as PBG, is a permit issued by the government to the owner of a building or its representatives to start construction, renovate, maintain, or change the building as planned. PBG can be issued if the proposed technical plan meets technical standards in accordance with the provisions of laws and regulations, to find out whether the technical plan meets technical standards or not, a consultation process is required involving experts who have the ability and expertise related to building.

What is the function of PBG?

  1. Ensure the construction of buildings with legal status.
  2. Ensuring the operation of the building meets the standards that ensure safety, comfort, health, and convenience for its users.
  3. To record the existence of the building plan.
  4. PBG is issued by the government according to its authority and issued no later than 3 months, depending on the function and classification of the building.

How quickly can this be done?

The process carried out in 3 months includes:

  1. Check Zone
  2. PBB check (UN arrears check)
  3. Submission of UN SKL
  4. Submission of ITR
  5. PBG Submission
  6. Technical Plan Check
  7. Check the location of the relevant agency
  8. Revision (when there are incomplete files)
  9. Calculation of Charges
  10. Payment of Levies
  11. PBG Publishing

Required documents

  1. SHM
  2. Applicant's ID card
  3. NPWP (except for residential building functions)
  4. NIB (except for Residential building function)
  5. Copy of PBB payment proof
  6. Spatial results
  7. Comparison statement
  8. Environmental permits (except for residential building functions)
  9. IMB image
  10. Structural analysis (if the building is 2nd floor and so on)
  11. Sondir (if the building is on the 2nd floor and so on)

Why is PBG Important?

To help you apply for the right PBG, R.E.D. Consulting has a team that is experienced in their field and knows the field conditions when submitting PBG. By leaving the management of your PBG production to us, you have saved your time.

Why Choose R.E.D Consulting to Handle Your Business Problem?

Benefit 1

Speed of Response

A key indicator of our dedication to our service and operational efficiency, making it an essential aspect of the tax service industry.

Benefit 2

Consistence Service

Our ability to deliver reliable, high-quality service every time a client interacts with taxation problem.

Benefit 3

Local Expert

Well-versed in regional tax incentives, credits, and deductions that might be overlooked by more generalized services.

Benefit 4

Flexible Solution

Providing personalized, adaptable, and responsive support to meet the unique needs of our client.

Benefit 5

Data Security

Ensuring our clients' sensitive financial and personal information protected from unauthorized access and cyber threats.

Benefit 6

Experienced Team

Years of hands-on experience and deep knowledge of tax laws and regulations, to deliver exceptional service.

Our Happy Partner

Contact Us for Exclusive Processing PBG & SLF

Don't let any tax benefits pass you by. For a free tax consultation and a solution designed exclusively for your company's needs, get in touch with us today. We can grow your company together and make it even better.

Get The Experts

Whatever the plan we got you covered

Most question asked on Processing PBG & SLF services.

How do I obtain a Building Permit?

To obtain a Building Permit, one typically needs to submit a set of detailed construction plans, pay the required fees, and complete an application process at the local building department or municipal office. The process may vary depending on the location and the type of construction project.

What types of projects require a Building Permit?

Most construction or renovation projects, including new buildings, renovations, structural alterations, electrical, plumbing, or mechanical installations, typically require a Building Permit. However, minor repairs or cosmetic changes may not require one.

What happens if I proceed without a Building Permit?

Constructing or renovating without a required Building Permit may result in legal consequences, fines, or orders to cease construction. Additionally, non-permitted structures may face difficulties during property inspections or potential problems when selling or insuring the property.